Remove Change Orders Remove Document Remove Inspections Remove Subcontracting
article thumbnail

Mayer Building Company for Subcontractors: Payment Guide & Resources

Levelset

Read a sample subcontract. Digging deeper into company processes for payment, change orders, lien waivers, and more will give you a sense of what to expect while working with them. . These documents are typical for most GCs, and any additional documentation will be requested by a project manager at Mayer Building Company. .

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

A Job Order Contract Execution Guide is a required element for any successful, best management practice JOC Program. The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. the time of award.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Orders / Task Orders. A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. The Owner reserves the right to inspect such off- site work at any. Subcontracts. Execution Procedures.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 63 36 Field Order Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 63 36 Field Order Form.