JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Any required documentation and/or forms.

article thumbnail

3 ways to avoid defects in construction

Lets Build

Design defects are a result of the design team failing to produce organised and accurate construction documents. Defects due to omission are typically fixed through change orders that add to the scope of work for one or more contractors. Inefficient document distribution. Store your documents in one place.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Autodesk Build is Available to All, Combines Capabilities of BIM 360 and PlanGrid

Construction Junkie

Combining the strong documentation abilities of BIM 360 and the field accessibility of PlanGrid, Autodesk Build is being offered as a complete solution for construction project management, quality control, safety reporting, project cost, and closeout. “By What is Autodesk Build? PlanGrid Build also includes compatibility with 3D models.

article thumbnail

The Complete Guide to Project Commissioning

Autodesk Construction Cloud

Much like shipbuilding, the process involves a series of documenting, scheduling, and testing processes. According to Whole Building Design Guide, “Buildings that are properly commissioned typically have fewer change orders , tend to be more energy-efficient, and have lower operation and maintenance cost.”

article thumbnail

Post River Software introduced Asphalt Pro mobile applications for asphalt contractors

Construction Cost Estimating

Post River Software introduced Asphalt Pro mobile applications. The tool consists of standard material and cost estimator as well as a complete set of tools to go with workflow and inspection practices for field application. The application also contains project documentation capabilities.

article thumbnail

Data Analytics Trends in Construction

Viewpoint Construction Technology

Construction sites these days have no shortage of data: design and BIM data from the planning stages of a project, jobsite data collected by wearables, mobile devices and sensors on equipment/materials, accounting and job progress data from the office, project management data and much more. Reducing Risk and Increasing Safety.

article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Sometimes, the project won’t pass inspection, or it will need to be torn down due to safety and health concerns. 2: Thoroughly Document Mistakes. If possible, make sure to document the mistake visually with photos. One small error has the potential to rapidly deteriorate other elements of a project.