article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Controlling construction costs is not rocket science, nor does it involve time travel. Validate Contractor and Subcontractor Quotes Obtaining comparative bids on all subcontracted work will not provide sufficient cost visibility. The post Controlling Construction Costs, Rocket Science, and Time Travel appeared first on 4BT.

Travel 177
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

PLEASE NOTE: In occasions where the contractor is asked to provide materials, equipment, and/or subcontract pricing for work by direct bidding that may, or. These negotiations must precede the JO award/approval and are not allowed on a Change Order basis. The UPB costs should NOT include contractor overhead and profit.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Travel time or costs associated with transportation between an employee’s residence and job site are not reimbursable. Out of state travel of any kind will not be reimbursed or allowed in the cost model. Subcontracts. Subcontract bid. Execution Procedures. Vendor identification number (if available).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).