Remove Commissioning Remove Drawings Remove Leases Remove Regulation
article thumbnail

M&V, MBCx, WTF: Building Performance Monitoring as a Means to Achieve Decarbonization Goals

Stok

As building owners and occupiers adopt zero commitments and find their properties subject to energy performance and emissions regulations, the question becomes, ‘how can we achieve these ambitious reduction targets?’ Define the Owner’s expectations on submetering energy end-uses, BAS trending and points, and informational dashboards.

article thumbnail

AEE WEST 2023: Building Performance Monitoring

Stok

As building owners and occupiers adopt zero commitments and find their properties subject to energy performance and emissions regulations, the question becomes, ‘how can we achieve these ambitious reduction targets?’ Define the Owner’s expectations on submetering energy end-uses, BAS trending and points, and informational dashboards.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Project Foundation Pt. 2: Building the Master Budget

Stok

This includes the architect, design engineers, project manager, and all other consultants such as Acoustical, AV, IT, Structural, Food Service, Code, Permit Expediter, Graphics / Signage, Commissioning Agent, and so on. Review the lease to see if Third Party review of drawings or Landlord oversight is the responsibility of your Client.

article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

But draw your own conclusions: This 2018 IgCC contains requirements that address site sustainability, water use efficiency, energy efficiency, indoor environmental quality, materials and resources, and construction and plans for operation. did not create a code that has garnered any market acceptance. Sec 901.4.1.4. Sec 1001.3.2

Green 156
article thumbnail

FEATURE STORY: High-Tech Hubs Are Moving To Their Markets

Buisness Facilities Contributed Content

Google Fiber is another lifestyle asset to draw talented engineers and developers to our region,” said Ryan Weber, President of KCnext, a non-profit industry advocacy group for technology in the region. Ceva will be the ninth company in the KBA facility, which is 80 percent leased. IceCure Medical is leasing space in GCIC’s 50,000 sq.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check throw regulator and spring assembly for tightness. building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check operation of all relays, pilot valves, and pressure regulators. Verify correct main line pressure leaving the main line air regulator.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

The developer, Houston-based Clean Line Energy, is awaiting approval from regulators in Iowa and Illinois before going ahead with the direct current line. A 2009 study commissioned by the State of Utah has identified 2,166 MW of geothermal potential existing with the state. These three new projects amount to over $1.25