Remove Commissioning Remove Drawings Remove Leases Remove Roads
article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

If GSA, as the “landlord of the federal government,” were to require or use something else, it would add cost to the building and leasing process across the building industry. Chatham County Commission. Drawing Conclusions LLC. International Commissioning Engineers West, Inc. Commissioning WorCx. DPR Construction.

article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

The wind power installed in Nebraska also will avoid over 950,000 metric tons of carbon dioxide emissions annually, the equivalent of taking more than 165,000 cars off the road. A 2009 study commissioned by the State of Utah has identified 2,166 MW of geothermal potential existing with the state. billion in project investment.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

Runway 9R-27L, located on the south side of the airport and running parallel to Griffin Road, is now being rehabilitated and lengthened. The Little Rock National Airport is operated by the Airport Commission, whose members are appointed by the Little Rock City Board of Directors. In its old configuration, the runway was only 5,276 ft.

Omaha 76
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. ALABAMA INDUSTRIAL ACCESS ROAD & BRIDGE PROGRAM: Provides financial assistance to communities for industrial access to new and expanding industries. It allows for the construction of roads, bridges, etc.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Obtain a current one-line drawing and verify meter is connected to the proper circuit.

article thumbnail

Industry Focus: Food Processing – The Process Of Consistency

Business Facilities

Arkansas currently has 538 buildings and 311 sites available at www.ArkansasSiteSelection.com , a collaborative effort between the Arkansas Economic Development Commission and Entergy Arkansas Inc. The Vineland, NJ plant makes millions of cases of soups each year at its facility on West Elmer Road. Just ask Hickman’s Family Farms.