Remove Commissioning Remove Environment Remove Negotiation Remove Transportation
article thumbnail

Environmental Regulations in Construction: What Contractors Need to Know

Levelset

Construction activity is incredibly intensive work — creating the built environment is inherently disruptive to the natural environment. The Resource Conservation and Recovery Act (RCRA) is a federal law that governs the generation, transportation, treatment, storage, and disposal of hazardous waste. Under 42 U.S.C.

article thumbnail

Autocar Chooses Alabama For $120M Investment

Business Facilities

Among them are access to a great business environment, strong state and local governmental partners, a skilled workforce, and proximity to our customers and suppliers.”. We are confident that Autocar’s suppliers will find a welcoming environment here as well.”.

Alabama 43
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Renewable Energy: The Power Of Change

Business Facilities

With the construction of the world’s largest solar-powered battery facility and an innovative green hydrogen pilot project, we are leading the state and nation in producing energy that is reliable, affordable and better for our environment.”. Applications are now open for the second cohort of companies to join the 35 Mules innovation hub.

Florida 115
article thumbnail

Logistics: On the Road, Water or Rails…or in the Air — AGAIN

Business Facilities

Presented by Penske Logistics and authored by transportation consultant, Rosalyn Wilson, senior business analyst at Parsons Corporation, the report tracks and measures all costs associated with moving freight through the U.S. The transportation sector of the logistics industry grew by 3.6 Costs for water transportation rose 8.9

Roads 41
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. Conditions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements. Conditions.

article thumbnail

LOCATION FOCUS: Texas: Big Heart, Country, Business

Buisness Facilities Contributed Content

Pauken is the chairman of the Texas Workforce Commission. percent in 2011 with top exporting industries that included petroleum and coal products, chemicals, computer and electronic products, non-electrical machinery and transportation equipment. It outperformed overall U.S. exports, which grew by 15.8

Texas 45