Remove Comparison Remove Drawings Remove Insurance Remove Overhead
article thumbnail

Types of Estimates in Building Construction

Construction Cost Estimating

Different types of estimates are prepared according to project manual and submitted drawing as well as objective of applying estimated data. Detail Estimate - It contains everything necessary for executing the project together with overhead and contractor's profit.

article thumbnail

Common Types of Construction Contracts And Their Use

cnstrctr

Competitive Value – if the drawings are complete, having competitively tendered the project can create value as people try to beat each other for the project. The contractor charges the owner based on the actual costs of the project including rates for overhead agreed to as part of the contract. Construction Contract Types.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. Include a statement of work, including concepts, sketches, and drawings; 3.6.1.3. Coefficients.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. Taxes, insurance, fringe benefits, and vacation allowances are to be included in the Contractor’s coefficient. The Contractor shall supply all required insurance prior to starting the project on the scheduled date.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Note all deteriorated areas on the roof plan for comparison later on the roof. Check operation of safety switches to insure they have not been by-passed.