article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

The Task Order price is the product of required tasks, quantity, unit of issue, UPG price per unit, and the coefficient plus the negotiated price for any non-priced items (NPI). NPIs must be within the basic intent and general scope of the contract and be negotiated separately from UPG items before issuance of the TO. TO negotiation.

article thumbnail

SPECIAL REPORT: Site Location Factors For Automotive Suppliers

Buisness Facilities Contributed Content

Site utilization for automotive suppliers from a feasibility, cost, and developmental risk perspective is typically driven by confirmation that the following location criteria are satisfied: Size, shape, topography and room for future expansion; site buffer should provide protection from residential and commercial neighbors. Great Lakes U.S.

Site 60
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. Labor costs will be reimbursed to the Contractor at the unit price rate multiplied by the Contractor negotiated coefficient(s). The Contractor may be reimbursed for Subcontractor at cost plus the negotiated coefficient.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

Jindal said the company is examining the feasibility of additional Louisiana projects that would bring the total new capital investment at its sites in the state to $1.2 In comparison, Hong Kong average peak connection clocked in at 57.5 billion over 10 years. The EU’s 28 nations must decide by Dec. Mbps and Belgium at 33.4

Metro 110
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

In some cases, soil testing by a civil, geotechnical, or soils engineer is better to assist formulate a feasible arrange. That method you''ll get competitive bids from deck specialists for comparison, or hold off on the project for a later date. Steep sites might have retentive walls or different approaches to soil stabilization.