article thumbnail

Tackle Any Schedule Change with Autodesk BuildĀ 

Autodesk Construction Cloud

Digitizing Version Comparison . The manual process of the past — comparing line item by line item on paper print outs or switching between two monitors — is just not a feasible solution when it comes to schedules that involve thousands of activities. . See Version Management and Comparison in Action .

Autodesk 105
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Analytical comparisons of the two techniques are then presented in section V as discussion. BIM is the life-cycle management of the built environment supported by digital technology.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report ā€“ Metro And Global Rankings

Buisness Facilities Contributed Content

Jindal said the company is examining the feasibility of additional Louisiana projects that would bring the total new capital investment at its sites in the state to $1.2 Moonbot, an animation and visual effects studio, helped put its hometown of Shreveport, LA on the global digital media map. billion over 10 years.

Metro 110
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect for corrosion. Make a visual inspection of the flue and chimney, checking for obstructions. Note all deteriorated areas on the roof plan for comparison later on the roof. Visually inspect equipment to ensure structural integrity, check all mechanical connections and fasteners for tightness.

article thumbnail

Total Station in Surveying |Ā Operations of Surveying | Advantage & Disadvantage of Surveying | Types of Surveying | Uses of Surveying

CivilJungle

Distance resolution is either pulsed (low precision) or phase comparison (average -Ā± 2 to t 5 millimeter(mm) accuracy). In the case of setting out, it makes it feasible to set control points for surveying with very little sighting through the telescope. Both laser and infrared EDMs are utilized.

article thumbnail

BIM Glossary Terms and Definitions ā€“ NBIMS-US ā€“ 2013

Building Information Management

The benefits include centralized and visual communication, early exploration of options, sustainability, efficient design, integration of disciplines, site control, as built documentation, etc.ā€“effectively Comparison and normalization of two or more similar standards including issues such as scope, specifications, guidance or implementation.

BIM 40