Remove Compensation Remove Insurance Remove Overhead Remove Presentations
article thumbnail

Job Order Contracting Guide

Job Order Contracting

Labor rates are for direct labor, without overhead and profit, however include fringe benefits and allowances for Social Security and Medicare taxes, worker’s compensation, unemployment insurance and employee benefits. Payroll taxes and workman’s compensation are included in the labor rates.

Contract 100
article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

Among the top safety measures implemented in your daily operations, you should ensure that all loads being moved are secured, caution employees to steer clear of suspended loads and overhead work, and strictly enforce the use of personal protective equipment (PPE) such as hard helmets and safety glasses. Electrocution. High temperatures.

Safety 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

The Case For Paying Marketers More

Help Everybody Everyday

Today, I’m going to make the case for why many marketers are not being properly compensated under Federal law. And I’m going to provide all the information you or they would need to decide for themselves whether or not anyone’s compensation needs to be adjusted. Last year, I sat through a legal presentation at a firm called Reed Smith.

article thumbnail

Construction Cost Estimating Blog: Techniques of Construction Cost.

Construction Cost Estimating

Construction cost estimating associates evaluating materials, labor, overhead, subcontractors and equipment needed to complete a project. Overhead Overhead costs such as securing permits, deposits for utilities, job site insurance, connecting utilities, and extraneous expenses (security, framing, etc.) adsense analytic.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Owner will be required to deliver such materials to the job site or compensate the Contractor for providing labor to deliver Owner-furnished materials to the job. Taxes, insurance, fringe benefits, and vacation allowances are to be included in the Contractor’s coefficient. Typically JOC coefficients range from 0.80 Over 5,000,000.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Any and all personnel involved in the use or maintenance of fall protection or who may, in the course of their work, be present on any elevated surface without a guard rail are required to have regular training in fall protection safety. Application: This standard applies to warehouse or large overhead rolling doors. Application 1.