SETTING OUT OF FOUNDATION TRENCHES
The Constructor
NOVEMBER 15, 2011
2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3) 3) The off-sets are measured from axial lines and the frontage lines are placed in their correct position relative to local requirements. (4)