Remove Construction Remove DOT Remove Overhead Remove Travel
article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

Businesses in an FTZ may see a reduction in duties on labor, overhead and profit. As the region’s conduit to travel, BNA often serves as the first and last impression of Nashville for travelers. million travelers, a nearly 10 percent increase over the previous year. FTZs jumped 24.8 percent from the previous year, to $99.2

Risk 40
article thumbnail

The Future of the New-Home Design Studio

Pro Builder

Sales centers, models, and design studios were typically not open during evenings, and most—if not all—appointments with sales, design, construction, and warranty were only in-person during typical business hours. as an industry, we are now ready to listen, adjust, and deliver the buying experience consumers demand.

Design 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

via Four BT, LLC – 4BT enables owners to consistently deliver quality facilities repair, renovation, and minor new construction projects on-demand, on-time, and on-budget. Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. ARCS-BAR-01-06M Frequency: Semi-annually.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Use good judgement to ensure that travel costs do not become excessive. The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions.