Remove Defense Remove Documentation Remove Drafting Remove Guidelines
article thumbnail

RELi Could be Standard Practice in Nearly Every Real Estate Transaction

Green Building Law Update

Much more than only anticipating weather extremes, in the draft document expected to be approved in the coming days, RELi 2.0 By selectively bundling existing sustainable and regenerative guidelines with RELi’s groundbreaking credits for emergency preparedness, adaptation, and community vitality, RELi 2.0 Of note, RELi 2.0

article thumbnail

Facility programming: The driving force behind healthcare design

The Korte Company

This exhaustive documentation compiles information from a wide range of sources to map out the evolution of a facility, campus or organization. Over time, as procurement decisions are delivered and design challenges are overcome, a program (and the drafts and renderings that bring them to life) becomes more detailed. CMS regulations.

Design 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

Responding to all document and other information requests by the OSHA inspector. Good documentation of what happened during the inspection is essential to refuting any citation issued. During the Opening Conference, or some time during the inspection, the inspector will ask to see certain records and documents.

OSHA 156
article thumbnail

Arbitration Update – The 2021 ICDR Arbitration Rules: A Welcome Update for International Construction Arbitration

Constructlaw

8 Arguably, the most noteworthy of these differences includes the ability of the ‘tribunal to manage the scope of document and electronic requests, and to manage, limit, or avoid US litigation-style discovery practices.’ These rules, however, do not expressly give the tribunal exclusive authority over these issues.’

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. This document includes five appendices.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” In addition to the qualifying expenses, at least 25% of the workforce on every project must be Colorado residents in order for the project to meet state incentive guidelines.

Income 108