article thumbnail

4 Commercial Construction Trends for Restaurant and Food Service Projects

HardHatChat

We’re also working with restaurant clients to make sure their mechanical infrastructure is set up to accommodate an extensive draft beer menu. In a retrofit scenario for a restaurant or bar setup where the existing underground chases are maxed out, the easiest way to boost capacity is installing additional chases and beverage lines overhead.

article thumbnail

Browz Contractor Management

Safety Services Company

Some companies just provide data maintenance and document processing services, which means that they simply take care of drafting downloadable safety programs and handing it back to you. We perform account review and monitoring designed to ensure success with Browz, Validation and Audits. We guarantee fast submission 72 hours or less.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

An airport of entry (AOE), usually designated with the word “international”, provides customs and immigration services for incoming flights. Businesses in an FTZ may see a reduction in duties on labor, overhead and profit. These services allow the airport to serve as an initial port of entry for foreign visitors arriving in a country.

Risk 40
article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Sage Estimating also facilitates forecasting the labor, raw material and other overhead costs so that the contractors can arrange & deliver correct bids. As soon as the project is procured, estimate details flow automatically into Sage business management software, removing unnecessary tasks and data entry errors.

Bidding 40
article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

O’Connell, Interior Graphic and Design Standards, S.C. CAD: Cadmium, Computer-Aided Drafting. OH: Overhead. OHD: Overhead Door. He is a sample listing of abbreviation derived across a wide venue of sources. 2-PSS: Two-Part Polysulfide Sealant. 2-PUMS: Two-Part Polyurethane Modified Sealant. @ At (the rate of). &

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. Minimum Design. Typically, minimum design for SABER is up to 35%.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Check all analog inputs work across the full range of designed input. Check all analog input work across the full range of designed input.