Remove Design Remove Estimating Remove Inspections Remove Procurement
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

Cost effective FSRM Facilities Facilities Sustainment, Restoration, and Modernization

Job Order Contracting

Cost effective facilities FSRM, Facilities Sustainment, Restoration, and Modernization can now be accomplished with the integration of robust process and planning, procurement, and project delivery teams within a common data environment (CDE) inclusive of current, local market, granular line item construction task data. Modernization.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Delivering Improved Construction Repair Renovation and Maintenance Outcomes

Job Order Contracting

Nonetheless, a small, but growing number of real property owners and facilities management teams have embraced changing to integrated LEAN construction planning, procurement, and project delivery processes. Regular owner inspections. Owner conducts final inspection or creates a punch list. Project kick-off meeting.

article thumbnail

Integrated Project Delivery Software and Support Services

Job Order Contracting

Integrated project delivery software and support services embed robust LEAN planning, procurement and project delivery processes within a common data and cloud technology environment. While fundamental LEAN elements serve as the foundation, solutions can be tailored to an organization’s individual requirements. Common Data Environment.

Software 150
article thumbnail

Job Order Contracting – The Legal Side

Building Information Management

“Job order contracting” is a procurement method used for maintenance, repair, alteration, renovation, remediation, or minor construction of a facility when the work is of a recurring nature but the delivery times, type, and quantities of work required are indefinite. Gov’t Code 2269.401. SELECTING A CONTRACTING METHOD; 2. Gov’t Code 2269.410.

Legal 520
article thumbnail

An Introduction to Job Order Contracting

Job Order Contracting

JOC reduces unnecessary levels of engineering, design, and contract procurement time along with construction project procurement costs by awarding long- term contracts for a wide variety of renovation, repair and new construction projects. Smaller projects were taking up to 1 year to procure creating a growing backlog of work.

Contract 100
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229