Remove Design Remove Inspections Remove Procurement Remove Safety
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

Safety Hazard on Construction Projects

The Constructor

This leads to the presentation of an Information Technology IT tool for construction project safety management Total-Safety and, in particular, a module within Total-Safety designed to help construction personnel develop method statements with improved levels of hazard identification.

Safety 114
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
article thumbnail

5 Current Construction Industry Challenges and How Technology Can Help

Fieldwire

From safety training and accident prevention to AR building assistance, technology does indeed belong on the drafting table and the construction site alike. Technology is assisting construction sites with materials and procurement through payment. Safety Incidents and Recordables. Supply Chain Issues.

article thumbnail

An Introduction to Job Order Contracting

Job Order Contracting

JOC reduces unnecessary levels of engineering, design, and contract procurement time along with construction project procurement costs by awarding long- term contracts for a wide variety of renovation, repair and new construction projects. Smaller projects were taking up to 1 year to procure creating a growing backlog of work.

Contract 100
article thumbnail

Construction project management 101 – Checklist

Lets Build

The business models, though, are of two forms — it’s either design, bid, build where the project owner chooses a contractor after the design phase or design-build where both design and construction phases are done by one contractor. Procurement. What project procurement method (e.g. The process.