article thumbnail

The Win-Win Job Order Contracting Solution

Job Order Contracting

OpenJOC(TM) Job Order Contracting provides all the tools, information, training, and technology needed to design, implement, and execute a cost-effective, transparent, and highly productive approach to reducing repair, renovation, and minor new construction backlogs.

Contract 100
article thumbnail

The high cost of low maintenance

BD+C

The primary causes of engineering failures are typically related to design flaws, material failures, construction deficiencies, deferred maintenance, or a combination of one or more of the previously mentioned reasons. The life cycle cost analysis provides knowledge of the concrete, environment, and structure.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why You Should Make 4D Construction Sequencing ‘Business as Usual’ – and How To Do It

Autodesk Construction Cloud

Enhanced collaboration : 4D sequencing bridges the communication gap between design, engineering, and execution teams. It provides a robust maintenance and management tool and ensures that the asset's life cycle is streamlined and sustainable. Capture the data: Easier said than done, but this is a must.

article thumbnail

Standards for Building Economics

Building Information Management

E917-15 Standard Practice for Measuring Life-Cycle Costs of Buildings and Building Systems. See also WK50280 proposed revision E1804-12 Standard Practice for Performing and Reporting Cost Analysis During the Design Phase of a Project. Subcommittee E06.81 on Building Economics. E833-14 Standard Terminology of Building Economics.

article thumbnail

Sustainability of DOD Buildings – Reuse of Existing Buildings

Building Information Management

•Full modernization with a strict application of Historic Preservation Standards ( HPS) and other DoD facility design standards. Full rehabilitation/modernization but with strict application of Anti-terrorism/ Force Protection requirements through building hardening, seismic and other DoD facility design standards. LEED Silver.

article thumbnail

Sustainability of DOD Buildings – Reuse of Existing Buildings

Building Information Management

•Full modernization with a strict application of Historic Preservation Standards ( HPS) and other DoD facility design standards. Full rehabilitation/modernization but with strict application of Anti-terrorism/ Force Protection requirements through building hardening, seismic and other DoD facility design standards. LEED Silver.

article thumbnail

LEAN JOB ORDER CONTRACTING comes to NEW MEXICO

Job Order Contracting

Also consider smaller firms that have less capital intensive overhead that comes a your expense. Our team has had decades of experience in all aspects of Job Order Contracting, LEAN processes, construction cost data, and life-cycle facilities management. Your Needs Matter. Want to improve your current JOC Program? .