Remove Design Remove Procurement Remove Roads Remove Schedule
article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Free Interior Design Softwares

The Constructor

All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building’s user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics).

Software 114
article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

This is a chance for everyone to get to know key stakeholders, breaking down siloes between procurement and legal, scheduling and management, and so forth. Review drawings and designs one final time At the start of the meeting, all drawings and designs should exist in a state of approval.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. It is kept in the mind that during the execution of the project, it is required to keep the process monitored for timely completion of the project, as per schedules.

article thumbnail

The Preconstruction Phase: Understanding the Process & Risks

Levelset

Before a construction project can begin, there is a lot of planning, number-crunching, designing, and scheduling that needs to occur. An architect, designer, or design-bid contractor will perform planning and engineering services for a prospective project owner, providing them with the information they need to move forward.

Risk 52
article thumbnail

5 Current Construction Industry Challenges and How Technology Can Help

Fieldwire

Technology is assisting construction sites with materials and procurement through payment. With procurement technology advancing every day, the new cloud-based, analytic-driven, mobile procurement options ensure that materials are purchased and in place to complete the project without downtime. Schedule Demo.