Remove Documentation Remove DOT Remove Drawings Remove Overhead
article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage Risk 

Autodesk Construction Cloud

An example of a data point might be the number of overhead mechanical racks installed on the job that day, or logging the root cause of a safety incident. From here you can apply more context and processes to an increasing number of information sets, which means you can start to connect the dots and identify patterns.

Risk 52
article thumbnail

The Future of the New-Home Design Studio

Pro Builder

Who in your company is tasked with the content creation for the data loaded into digital tools, options-specific software, and hard-copy documents that communicate the design options available? More importantly, builders need to start realizing that “garbage in” means “garbage out.” Supply Side: Builder Needs and Capabilities.

Design 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

You describe what will be delivered when, how much the customer owes, and sign on the dotted line. They also include overhead costs such as insurance, mileage, a portion of your office rent. Designers also have more input in the construction drawing process, reducing the need for changes. . A contract’s a contract, right?

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. As of this writing, the most recent document was authored in 1997. As of this writing, the most recent document was authored in 1997. Application 1.