Remove Documentation Remove Estimating Remove Sustainability Remove Work in Progress
article thumbnail

Job Order Contracting – Recommended Best Practices

Job Order Contracting

Conduct a strategic review of your organization’s facilities/infrastructure repair, renovation, maintenance, sustainability, and minor new construction requirements, including a gap analysis of current process and issues and desired outcomes as well as current and required resources. We hope you benefit from the following information.

Contract 100
article thumbnail

BIM Pioneers: From 2D to 3D with Rodio Swissboring

Autodesk Construction Cloud

Without a central repository for all project information, key data like calculations, design plans and documents were stored on individual computers, making it difficult for collaborators to share easily and access information. Working in a digital environment eliminates the need for printing several versions of the same document.

BIM 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

facilities inspection programs generate requirements for sustainment, restoration, modernization work and minor new construction. The appropriate work management office is responsible for assessing the validity of the work request, checking for duplication with other requests, classifying the category of work, checking the.

Contract 100
article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

No contractor and limited A/E assistance with detailed estimating, plan checking, and constructability reviews during design phase. While high set up costs required larger projects, project types must be relatively straightforward, where requirements can be fully documented at request for proposals (RFP) stage. Not fully collaborative.

Design 130