Remove Documentation Remove Feasibility Remove Presentations Remove Visualization
article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality CaptureĀ 

Autodesk Construction Cloud

For starters, you’re dealing with an old structure without CAD files and limited documentation. feel that time constraints and urgency present the greatest risk to decision-making. . As the project progresses, leaders can take floor-by-floor laser scans to capture and document work being done or as-builts.

Design 119
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. While some could argue that some issues are better left unsaid, it is not at any one interest to continue to pretend as everything is right and thus failed to present our side of the case.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Any and all personnel involved in the use or maintenance of fall protection or who may, in the course of their work, be present on any elevated surface without a guard rail are required to have regular training in fall protection safety. Visually inspect for corrosion. As of this writing, the most recent document was authored in 1997.

article thumbnail

Safety Programs

Safety Services Company

Inspect your work area and facilities thoroughly by doing a visual inspection, auditing, testing, technical or scientific evaluation, analysis of injury or things that can go wrong, their consequences, how they happen and how likely it is that the hazard will occur. . Ā· Psychological work environment. . Safety Programs Training.

Safety 48
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. 50,000 (max.) for projects creating at least 100 jobs.

Income 108
article thumbnail

Best Practices for Multiple Award IDIQ ā€“ Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. Last Updated: February 19, 1999.

article thumbnail

BIM Glossary Terms and Definitions ā€“ NBIMS-US ā€“ 2013

Building Information Management

The benefits include centralized and visual communication, early exploration of options, sustainability, efficient design, integration of disciplines, site control, as built documentation, etc.ā€“effectively Information is data recorded in some Form (Document or Display). link] 14040:2006. 10) [link]. Life-cycle Costs. Roadmap.

BIM 40