article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality CaptureĀ 

Autodesk Construction Cloud

feel that time constraints and urgency present the greatest risk to decision-making. . Being able to track progress on-site provides a visual account of what was done in each phase of the project using laser scan snapshots. Use clash detection in Navisworks to determine the feasibility of new mechanical systems. .

Design 119
article thumbnail

Green Events: Home Design & Building Seminars

Green Home Design Architect

Our philosophy is that anything that can be done better and is financially feasible, should be done. This presentation includes passive and active design, guiding principles, and the phases of home design. are very popular, as they create visual interest in specific areas of the home for generally less money.

Green 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Total Station in Surveying |Ā Operations of Surveying | Advantage & Disadvantage of Surveying | Types of Surveying | Uses of Surveying

CivilJungle

Compatibility with present data collectors (if not purchased with the total station), such as (including batteries and battery life), simplicity of performance, and training requirements. In the case of setting out, it makes it feasible to set control points for surveying with very little sighting through the telescope.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Any and all personnel involved in the use or maintenance of fall protection or who may, in the course of their work, be present on any elevated surface without a guard rail are required to have regular training in fall protection safety. Visually inspect for corrosion. Visually inspect equipment for body shearing or pinch points.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. While some could argue that some issues are better left unsaid, it is not at any one interest to continue to pretend as everything is right and thus failed to present our side of the case.

article thumbnail

Safety Programs

Safety Services Company

Inspect your work area and facilities thoroughly by doing a visual inspection, auditing, testing, technical or scientific evaluation, analysis of injury or things that can go wrong, their consequences, how they happen and how likely it is that the hazard will occur. Stay safe from hazards and risks! Safety Programs Training.

Safety 48
article thumbnail

Best Practices for Multiple Award IDIQ ā€“ Task and Delivery Order Contracting

Building Information Management

Streamlining Ordering TechniquesUse of Oral Presentations. Consider using oral presentations to reduce lead time and contractorsā€™ proposal preparation costs. Plan ahead for oral presentations to allow sufficient time for scheduling of conference room space and evaluators attendance. Work Orders Within Task Orders.