Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Common Types of Construction Contracts And Their Use

cnstrctr

A construction contract is a document that outlines the roles and responsibilities between two or more parties on a project. It is a legally binding document that the groups agree to at the start of a project and are held accountable to throughout. The contract would be solely based on those documents and the scope of work.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting Glossary

Building Information Management

. “Job order contract technical specifications” – A book (electronic and/or hardcopy), referenced by the owner, detailing the construction requirements and guidelines with regard to quality of materials and workmanship to be used by the job order contractor in accomplishing the tasks listed in the unit price catalog.

article thumbnail

LEAN OpenJOC(TM) Job Order Contracting for Sustainable Facilities Repair, Renovation, and Minor New Construction

Job Order Contracting

The primary advantage of JOC has historically been is the flexibility permitted in ordered quantities and delivery scheduling. A public agency can place orders with one or more contractors when the actual need appears and received on-demand services from a vetted service provider. Unit Price Books developed without overhead & profit.

Contract 100
article thumbnail

What are Independent Government Estimates – IGEs?

Building Information Management

This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Follow OSHA guidelines for permitting of entry and atmospheric testing of confined spaces. Recommended Tools, Materials, and Equipment: 1.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. This document includes five appendices.