Remove Documentation Remove Guidelines Remove Overhead Remove Travel
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Make Crane Safety Priority One!

Constructonomics

This post was written by SPANCO, an industry leader in overhead cranes since 1979. Overhead and gantry cranes have three axes of directional travel: vertically in the direction of the hoist and load hook, laterally along the path of the trolley, and forward and back along the path of the bridge. THE EQUIPMENT.

Safety 158
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What are Independent Government Estimates – IGEs?

Building Information Management

This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting GUIDELINES & PROCEDURES. A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Travel time or costs associated with transportation between an employee’s residence and job site are not reimbursable.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Follow OSHA guidelines for permitting of entry and atmospheric testing of confined spaces. As of this writing, the most recent document was authored in 1997.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. This document includes five appendices.