Remove DOT Remove Drafting Remove Overhead Remove Software
article thumbnail

Can We Make Home Building a Little Less ‘Interesting?’

Pro Builder

Sometimes it’s just vague specifications by your local drafting department, other times it’s the lumber/truss/panel operations that push it to the high side, and yes, often it is the engineers who are not taking the time to do fresh calculations on each home. Blame it on the software or blame it on the users.

Overhead 105
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Defragment the hard drive using the Windows defragmentation utility or third party software on the workstation or server. Standard Tools – Basic. BAS Server.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.