Remove Drafting Remove Feasibility Remove Insurance Remove Schedule
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

Special Enumerated Fees You or your contractor can want correct insurance policy to shield the building throughout construction, and to shield against damage to others (liability). Banks, Insurance agents, Surveyor, Engineers and Lawyer. Project Revision Fee 13. Zoning Fee 14. Re-Inspection Fee/Extra Inspections 15. Re-Review Fees 16.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Schedule maintenance on these doors so that it does not interfere with loading dock operations. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Schedule shutdown with operating personnel. Review manufacturer’s instructions.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The exceptions are for financial institutions, financial institution groups, and insurance companies that have a maximum business privilege tax of $3,000,000. This credit can also be claimed against the insurance premium tax, the oil and gas production and property taxes, the fisheries business and landing taxes, and the mining license tax.

Income 108
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Determining the feasibility of using other DoD contracts. A sample SABER project scheduled for an award later under the resulting SABER contract. The level of architectural/drafting support performed by the contractor (not to be interpreted to mean A-E services); 3.5.3.1.6.