Remove Drawings Remove Fabrication Remove Inspections Remove Overhead
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. authorization. Job Conditions.

Contract 100
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. Include a statement of work, including concepts, sketches, and drawings; 3.6.1.3. Coefficients.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

DWG: Drawing. DWGS: Drawings. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. INSP: Inspect. OH: Overhead. OHD: Overhead Door. VF: Vinyl Fabric. WWF: Welded Wire Fabric. DRBD: Drainboard. DS: Downspout, Disconnect Switch, Door Switch. DSP: Dry Standpipe. DT: Drain Tile.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

DWG: Drawing. DWGS: Drawings. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. INSP: Inspect. OH: Overhead. OHD: Overhead Door. VF: Vinyl Fabric. WWF: Welded Wire Fabric. DRBD: Drainboard. DS: Downspout, Disconnect Switch, Door Switch. DSP: Dry Standpipe. DT: Drain Tile.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

DWG: Drawing. DWGS: Drawings. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. INSP: Inspect. OH: Overhead. OHD: Overhead Door. VF: Vinyl Fabric. WWF: Welded Wire Fabric. DRBD: Drainboard. DS: Downspout, Disconnect Switch, Door Switch. DSP: Dry Standpipe. DT: Drain Tile.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. If off-site time and materials work is required, such as site fabrication, the Owner shall be so notified at the time of the issuance of the TO by the Contractor. The Owner reserves the right to inspect such off- site work at any.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 21 19 Testing and Inspecting Allowances. 01 33 23 Shop Drawings, Product Data, and Samples. 01 43 19 Fabricator Qualifications. 01 45 23 Testing and Inspecting Services.