article thumbnail

SPECIAL REPORT: Site Location Factors For Automotive Suppliers

Buisness Facilities Contributed Content

Site utilization for automotive suppliers from a feasibility, cost, and developmental risk perspective is typically driven by confirmation that the following location criteria are satisfied: Size, shape, topography and room for future expansion; site buffer should provide protection from residential and commercial neighbors. 4) Labor Draw.

Site 60
article thumbnail

Signs It’s Time to Replace Your Sump Pump | How Old Is Your Sump Pump | Is Your Sump Pump Running All the Time

CivilJungle

So, it will make it feasible for the substantial part to be very recent. Proceed with sump basin space- switch the sump pump basin upended and place it on the lowest surface with the pencil, draw a straight line surrounding the sump pump basin, then separate the bay. How Old Is Your Sump Pump? 1’ PVC concrete paver.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. Hawaii-based companies that receive Phase I feasibility study SBIR awards can apply for funds from HTDC’s Hawaii SBIR Matching Grant program. HAWAII SMALL BUSINESS INNOVATION RESEARCH PROGRAM (SBIR): A $2.2 BUSINESS TAX CREDITS.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Manhole, Sewer. Application: This standard applies to manholes which contain sanitary sewer lines or other related piping systems. Examine structural features of sewer line, interior of manhole, manhole frame and cover, etc. Obtain a current one-line drawing and verify meter is connected to the proper circuit.