Remove Drawings Remove Foundation Remove Inspections Remove Structural Engineering
article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

List of Civil Engineering Software: This software are substantially beneficial in Construction projects. Software Required for Drafting or Drawing. Software Required for 3d Modeling of Structure/Architecture. Software Required for Drafting or Drawing: The types of Software Required for Drafting or Drawing are as follows. #1a.

article thumbnail

Streamlining Construction Workflows: Hodari Africa  Excels with Autodesk Build

Autodesk Construction Cloud

At the same time, the architects and structural engineers worked from South Africa. By adopting Autodesk Build, Hodari created an environment that eliminated fragmented communication and was the foundation for improving team collaboration. Information is risked on email – it goes missing and can get lost,” says Deric.

Autodesk 124
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Definition of Design Period | Why Design Period is Provided | Factors Affecting Design Period | Design Period Values

CivilJungle

Also, Read: What Is Pier and Beam Foundation | Advantages & Disadvantage of Pier and Beam Foundations | Pier and Beam Foundation Design | How to Build a Post and Pier Foundation. Following are some aspects which act on the Design Period of the structure: Availability of Funds. Short Note.

Design 52
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

Other common causes of structural failure are: (5) lack of appropriate professional design and construction experience, especially when novel structures are needed. (6) 8) inadequate preparation and review of contract and shop drawings. (9) 7) unwarranted belief in calculations and in specified extreme loads and properties. (8)

Concrete 177
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. All drawing like Plan, Elevation, Section. Structural Certificate.

article thumbnail

Load Bearing Wall Construction | How to Tell If a Wall Is Load Bearing | Load Bearing Beam | Non-Load Bearing Wall | Non-Load Bearing Wall Framing

CivilJungle

A load-bearing wall is a wall that is an active functional structure of a building, which carries the weight of the building above it, then transfers the total weight to the foundation structure beneath it. Also, Read: What Is Superstructures | Difference Between Load-Bearing and Framed Structures. Load Bearing Beam-.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

DWG: Drawing. DWGS: Drawings. FDN: Foundation. FDTN: Foundation. FND: Feminine Napkin Dispenser, Foundation. INSP: Inspect. SCFT: Structural Clay Facing Tile. SE: Structural Engineer. DRBD: Drainboard. DS: Downspout, Disconnect Switch, Door Switch. DSP: Dry Standpipe. DT: Drain Tile.