Remove Drawings Remove Information Remove Inspections Remove Overhead
article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. . Architectural drawings. It will touch on information such as: Who will complete the work on the project.

article thumbnail

Door Closer Hinges: A New Approach

Construction Specifier

Innovative engineering has made closer hinges more compact and functional; the new generation of products provides unique combinations of features and benefits to address door closing challenges that are not satisfactorily met by overhead surface-mounted door closers. Performance. The closer hinges have built-in door stops. Aesthetics.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

Instead, the Government applies “area cost factors” or “location factors” to attempt to localized the cost information. general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a)

Contract 226
article thumbnail

Measurement Fails in Business, Part II: Real-World Examples and Solutions

Pro Builder

To balance the material coming out, we would pile excess product without recording it, in a massive storage area when exceeding quota and then draw from it when we fell short. I wonder how often the Pittsburgh decision-makers were overhead proclaiming “The numbers don’t lie! Final inspection? Measurement Fails, Part I.

Permits 98
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Application: This standard applies to warehouse or large overhead rolling doors. Inspect gear box, change or add oil as required. Tool Group A.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). The ORGANIZATION NAME Procurement Authority will authorize a Job Order (JO) for performance of work, or request additional information/changes. The UPB costs should NOT include contractor overhead and profit. authorization. UPB rate and the Contractor’s multiplier. Scheduling.

Contract 100
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. Do not consider this information cost or pricing data in the context of FAR 15. Coefficients.