Remove Drawings Remove Maine Remove Permits Remove Subcontracting
article thumbnail

Construction Project Closeout

cnstrctr

Depending on what type of project you are on, project closeout will look different, but depending overall there should be three main areas you need to be focusing on: Turnover and Permit Closeout. Construction Turnover and Permit Closeout. Getting these items completed so the building inspector can close your permit.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

PLEASE NOTE: In occasions where the contractor is asked to provide materials, equipment, and/or subcontract pricing for work by direct bidding that may, or. Main Office Expense. Subcontracts: Contractors may use the services of Subcontractors if noted in Contract. The UPB costs should NOT include contractor overhead and profit.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. This credit cannot be carried forward or back, and cannot be used to generate a refund to the taxpayer.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets.