Remove Electrical Remove Infrastructure Remove Negotiation Remove Procurement
article thumbnail

Preferred bidders unveiled for £10bn electricity network deal

Construction Enquirer

Electricity network giant SSEN Transmission has confirmed ten preferred bidders for a £10bn onshore infrastructure upgrade. Following a competitive procurement process, Balfour Beatty, Siemens Energy BAM, J.

article thumbnail

Renewable Energy: The Power Of Change

Business Facilities

A ccording to the International Energy Agency (IEA), based on current policy settings and economic trends, electricity generation from renewables, including hydropower, wind and solar PV, is on track to grow by 8 percent in 2021 and by more than 6 percent in 2022. as measured by retail electricity produced and sold, serving more than 5.6

Florida 115
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Equipment or transmission lines used directly in producing or transmitting electrical power, but not including distribution. ALABAMA - updated for 2014.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. IDBs can be issued by the California Infrastructure & Economic Development Bank (I-Bank), cities, counties and joint powers authorities and do not constitute an obligation of either the state or the local government issuer.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements. Site and Infrastructure Subgroup: Divisions 30 – 39. 00 00 00 Procurement and Contracting. 00 20 00 Instructions for Procurement.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements. Site and Infrastructure Subgroup: Divisions 30 – 39. 00 00 00 Procurement and Contracting. 00 20 00 Instructions for Procurement.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

The core competencies identified include competencies relating to building operations and maintenance, energy management, sustainability, water efficiency, safety (including electrical safety) and building performance measures. o O perating and Maintaining HVAC Systems o O perating and Maintaining Electrical and. Project Management.