Remove Environment Remove Feasibility Remove Presentations Remove Visualization
article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality CaptureĀ 

Autodesk Construction Cloud

feel that time constraints and urgency present the greatest risk to decision-making. . You can store and organize imported NWC mesh files using Autodesk Docs’ common data environment, enabling better data access and collaboration. . Use clash detection in Navisworks to determine the feasibility of new mechanical systems. .

Design 119
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Analytical comparisons of the two techniques are then presented in section V as discussion.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Safety Programs

Safety Services Company

Inspect your work area and facilities thoroughly by doing a visual inspection, auditing, testing, technical or scientific evaluation, analysis of injury or things that can go wrong, their consequences, how they happen and how likely it is that the hazard will occur. Immediately correct a hazard if possible.

Safety 48
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Any and all personnel involved in the use or maintenance of fall protection or who may, in the course of their work, be present on any elevated surface without a guard rail are required to have regular training in fall protection safety. Visually inspect for corrosion. Visually inspect equipment for body shearing or pinch points.

article thumbnail

Total Station in Surveying |Ā Operations of Surveying | Advantage & Disadvantage of Surveying | Types of Surveying | Uses of Surveying

CivilJungle

Sometimes, vendors will offer to come to the district and exhibit their own equipment on your local operating environment Also, read: Principle of Plane Table Surveying Methods |Equipment | Error | Advantage | Limitation General of Total Station Total station surveys are conducted similarly to transit stadia or plane table alidade surveys.

article thumbnail

Best Practices for Multiple Award IDIQ ā€“ Task and Delivery Order Contracting

Building Information Management

Thanks to the clarification provided in FASA, agencies can now use these contracts with greater confidence, and, at the same time, realize the benefits of an ongoing competitive environment throughout the duration of the contract while minimizing the delays of conducting a separate procurement for each requirement.

article thumbnail

BIM Glossary Terms and Definitions ā€“ NBIMS-US ā€“ 2013

Building Information Management

The benefits include centralized and visual communication, early exploration of options, sustainability, efficient design, integration of disciplines, site control, as built documentation, etc.ā€“effectively effectively developing an asset lifecycle process and model from conception to final retirement. (1) link] 14040:2006. 10) [link].

BIM 40