article thumbnail

15 Tennessee Communities To Receive Site Development Grants

Buisness Facilities Contributed Content

We want to help them up their game and increase their close rate by making our rural county site inventory among the most attractive and project ready in the world.”. Union City Northwest Tennessee Regional Industrial Center, $450,000: Grading of approximately 15.5

article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

Slow economic growth has kept the percentage low, but the supply chain sector has made great strides in productivity, asset utilization and inventory management in the past three years.” There is no inventory tax, which is particularly advantageous to distribution companies. “Logistics costs as a percentage of GDP in the U.S.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State Focus: Arkansas – Easy To Reach, Easy To Grow

Buisness Facilities Contributed Content

Arkansas’s railroad infrastructure includes three Class I systems: Union Pacific, BNSF Railway, and Kansas City Southern Railway. Union Pacific operates major yards in Little Rock and Pine Bluff, along with a locomotive repair facility in North Little Rock.

article thumbnail

Logistics: On the Road, Water or Rails…or in the Air — AGAIN

Business Facilities

percent in 2014 due to stronger shipment volumes and inventory carrying charges that were up 2.1 because of its strong pro-business environment. The existing warehousing inventory in DuPage County’s sub-market has over 180 million square feet of rentable building area, making it one of the top two markets in the Chicagoland area.

Roads 41
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Labs 21 National Conference 2012 – “High Performance Healthcare Environments: Metrics and Procedures”. . . That said, major cultural change must occur in order to make significant progress.

BIM 45
article thumbnail

2020 Pro Builder Top 100 Products

Pro Builder

Sustainability is also a focus, in order to help consumers contribute to a cleaner environment. Specifically designed and engineered to meet the rigors of the environment, it is backed by a 50-year limited warranty and comes in 16-foot lengths available in four thicknesses and nine widths. Smart Oven / KitchenAid.

Products 116
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Labs 21 National Conference 2012 – “High Performance Healthcare Environments: Metrics and Procedures”. . . That said, major cultural change must occur in order to make significant progress.

BIM 40