article thumbnail

Repower off-highway diesel equipment with EPA-compliant replacement engines

CK Power

Today, all newly manufactured off-highway diesel equipment (e.g., generators, air compressors, construction equipment) must be powered by a T4F-certified engine. Even so, there’s still a sizeable population of in-service equipment powered by lower tier engines, and engines produced before the tiered regulations were introduced.

article thumbnail

Construction of World Trade Centers

The Constructor

In gaining approval for the project, the Port Authority of New York and New Jersey agreed to take over the Hudson & Manhattan Railroad which became the Port Authority Trans-Hudson (PATH). The original World Trade Center was designed by Minoru Yamasaki in the early 1960s using a tube-frame structural design for the twin 110-story towers.

Concrete 114
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FEATURE STORY: Talking The Talk And Backing It Up With Results

Buisness Facilities Contributed Content

When we scheduled a chat with Gov. I think that companies understand the benefits of being able to keep more of the money they earn so that they can reinvest it in their businesses by hiring more workers, buying equipment or conducting research.”. Texas Governor Rick Perry. By Jack Rogers. From the September/October 2013 issue.

Texas 49
article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

In comparison, railroads are in a much better position regarding infrastructure, equipment and personnel. Three Class I railroads (Norfolk Southern, Canadian Northern and the CSX) serve Decatur and are directly interconnected through a privately owned intermodal ramp as part of the Midwest Inland Port.

article thumbnail

INDUSTRY FOCUS: The Process of Food

Buisness Facilities Contributed Content

What may have otherwise demanded an hour can be accomplished in less than ten minutes, taking a strain off most families and individuals with tight schedules. million of infrastructure (roads, water, sewer, lighting and a railroad siding) was constructed at no cost to local taxpayers. In 2010, NY ranked second in the U.S.

article thumbnail

The Process of Food

Buisness Facilities Contributed Content

What may have otherwise demanded an hour can be accomplished in less than ten minutes, taking a strain off most families and individuals with tight schedules. million of infrastructure (roads, water, sewer, lighting and a railroad siding) was constructed at no cost to local taxpayers. In 2010, NY ranked second in the U.S.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. 00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. 00 01 20 List of Schedules.