Remove Estimating Remove Foundation Remove Inspections Remove Schedule
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. The problem areas, effects in foundation and defects in structure due to those causes are presented here. Insufficient width of foundation Settlement of foundation occurs due to insufficient distribution of load.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Cost effective FSRM Facilities Facilities Sustainment, Restoration, and Modernization

Job Order Contracting

As a result, FSRM cost estimates and the ability to validate constractor proposal have suffered. The use of generic cost estimating software or spreadsheets are not appropriate for JOC. Sustainment includes regularly scheduled adjustment and inspections, maintenance, and emergency response and service calls for minor repairs.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Rubble Stone Soling: The rubble stone generally used are of best variety of black trap / granite / basalt or other variety of stone available locally. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) 2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3)

article thumbnail

Integrated Project Delivery Software and Support Services

Job Order Contracting

While fundamental LEAN elements serve as the foundation, solutions can be tailored to an organization’s individual requirements. Early and ongoing involvement of internal and external teams, inclusive of joint scope and schedule development Reliance upon local, on-site service delivery partners (AEs, builders…).

Software 150
article thumbnail

How to Build a Pool Surviving the Inground Pool Construction Inspections

Construction Cost Estimating

In most areas of the country when building an inground pool, permits along with inspections are required as with any construction process. Structural, Electrical and Plumbing inspections during construction, and a Final inspection when you finish building your inground pool.