Remove Estimating Remove Foundation Remove Liability Remove Miami
article thumbnail

Air barriers: An essential part of the building envelope

GCP Applied Technologies

Estimating energy savings. The study included cities in a variety of climatic zones—including Miami, Phoenix, St. Estimating energy savings. The tool provides a graphical estimate of predicted savings by reducing air infiltration at the target leakage rate. December 07, 2018. Protecting your building envelope.

article thumbnail

Pulse: 07/23/2012

ENR Construction

The construction cost has been estimated at $20 million. Texas Alterra 500 South Ervay LLC, a limited liability company of Alterra International, is planning to redevelop the Butler Brothers building in Dallas. The estimated construction cost is $55 million. The estimated construction cost is $100 million. Miami, 33137.

Alabama 28
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Feature Story: 2016 Economic Development Awards

Buisness Facilities Contributed Content

There are an estimated 4,000 bridges in PA rated structurally deficient.]. Navagant Research forecasts that the global SGaaS market, estimated at $1.7 Led by the Research Foundation of the State University of New York (RF SUNY), the photonics institute involves a consortium of 124 partners, including 55 companies, across 20 states.

Indiana 40
article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

Established in 1986, PSC is supported by several federal agencies, the Commonwealth of Pennsylvania and private industry, and is a leading partner in XSEDE (Extreme Science and Engineering Discovery Environment), the National Science Foundation cyberinfrastructure program. science and engineering. Fort Lauderdale-based Citrix Systems, Inc.

Omaha 76
article thumbnail

FEATURE STORY: 2013 Economic Development Awards

Buisness Facilities Contributed Content

AeroTurbine, the Miami-based aviation supply company is expanding to a new, 264,000-square-foot building in Miramar. Taxpayers may apply 10 percent of the total credit amount per year over a ten-year period against their corporate business tax, insurance premiums tax or gross income tax liability.

El Paso 106