article thumbnail

Innovative Approaches to Industrial Construction Project Management

Construction Marketing

This has obviously led to large-scale improvements in the way structures are designed and building materials are fabricated. It streamlines scheduling. Sure, adding solar panels, PV windows, the best insulation for exterior walls , and water harvesting are all wonderful ideas for creating green buildings.

article thumbnail

6 Reasons Why Prefabrication Is Perfect for Building Manufacturing Facilities

Autodesk Construction Cloud

Fabricating components off-site leads to more consistent builds and higher quality outputs. By contrast, prefabrication extracts whole elements from the jobsite, giving owners greater certainty over cost, schedule and output. Now, prefabrication can bring the two worlds closer together. 2: Access to the power of productisation.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

CAD Shack: Revit MEP How to Create a Lighting Fixture Schedule

CAD Shack

Revit MEP How to Create a Lighting Fixture Schedule. A big advantage is the ability to quantify Revit objects in schedules. Out of the box, a user need only understand the scheduling function in Revit to start leveraging that data inherent in the model. Revit schedules report data that is contained in families.

CAD 45
article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Steel: Steel is also used in pre-fabricated formwork. Purpose made steel forms are fabricated when dimensional tolerances are critical, or when the forms are planned to be re-used. Aluminium: Often used in pre-fabricated formwork, that is put together on site. waffle floors).

Materials 136
article thumbnail

4 ways designers can help chief heat officers reduce climate change risks

BD+C

Create a strategy for shade Natural shade should be a priority everywhere, with fabricated shade structures augmenting trees with additional shade opportunities. Building electrification Natural shade should be a priority everywhere, with fabricated shade structures augmenting trees with additional shade opportunities.

Risk 52
article thumbnail

Construction Business Owner Blogs

Construction Business Owner

Green Building. BIM & Pre-Fabrication. Even the scheduling person can create a 4-D simulation (that’s one that includes time in addition to a 3-D model) of the construction project to determine the most efficient way to get the project built. Green Building. STRATEGY |. MANAGEMENT |. ACCOUNTING |. SOFTWARE |.

article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

2) poor communication between the fabricators and erectors. (3) The most common causes of structural failures are: (1) Poor communication between the various design professionals involved, e.g. engineers involved in conceptual design and those involved in the supervision of execution of works. (2)

Concrete 177