Remove Fabrication Remove Guidelines Remove Overhead Remove Security
article thumbnail

Job Order Contracting Guide

Job Order Contracting

Labor rates are for direct labor, without overhead and profit, however include fringe benefits and allowances for Social Security and Medicare taxes, worker’s compensation, unemployment insurance and employee benefits. It is assumed that all workers are skilled for the particular task in concert with safety (OSHA) requirements.

Contract 100
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. The UPB costs should NOT include contractor overhead and profit. The contractor typically bears overhead costs as part of the proposed coefficient of the JOC program. Scheduling.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

ADAAG: Americans with Disabilities Act Architectural Guidelines. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. OH: Overhead. OHD: Overhead Door. SEC: Second, Section, Secondary, Security System. VF: Vinyl Fabric. WWF: Welded Wire Fabric. ACR: Acrylic. ACST: Acoustic. O: Oxygen.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ADAAG: Americans with Disabilities Act Architectural Guidelines. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. OH: Overhead. OHD: Overhead Door. SEC: Second, Section, Secondary, Security System. VF: Vinyl Fabric. WWF: Welded Wire Fabric. ACST: Acoustic. ADD: Addendum; Addition.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ADAAG: Americans with Disabilities Act Architectural Guidelines. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. OH: Overhead. OHD: Overhead Door. SEC: Second, Section, Secondary, Security System. VF: Vinyl Fabric. WWF: Welded Wire Fabric. ACST: Acoustic. ADD: Addendum; Addition.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting GUIDELINES & PROCEDURES. Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. Contractor is responsible for receiving and securing materials, including unloading of delivery trucks, checking deliveries, and transportation to the work area.