article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

The office building is scheduled for completion by spring 2015 with the residential complex following in the summer. 1000 pound thrust; and Investments into new local capabilities including design, fabrication, and remote hot fire test capabilities for “Green” propulsion systems. With its proximity to the center of the U.S.

Metro 110
article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Fabrics labeled with the Underwriters Laboratories Inc., Ordinary maintenance means routine recurring work that is incidental to everyday operations; preventive maintenance means work programmed at scheduled intervals. Service levels are based on the effort required to service space for a five-day week, one eight-hour shift schedule.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Fabrics labeled with the Underwriters Laboratories Inc., Ordinary maintenance means routine recurring work that is incidental to everyday operations; preventive maintenance means work programmed at scheduled intervals. Service levels are based on the effort required to service space for a five-day week, one eight-hour shift schedule.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. 00 43 86 Proposed Work Plan Schedule Form. 00 01 20 List of Schedules.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 43 73 Proposed Schedule of Values Form. 00 43 83 Proposed Construction Schedule Form. 00 43 86 Proposed Work Plan Schedule Form. 00 01 20 List of Schedules.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. RR: Railroad. SCH: Schedule. SCHED: Schedule. VF: Vinyl Fabric. WWF: Welded Wire Fabric. F TO F: Face to Face. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FAG: Fire Alarm Gong. FAO: Finish All Over. FAR: Floor Area Ratio.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. RR: Railroad. SCH: Schedule. SCHED: Schedule. VF: Vinyl Fabric. WWF: Welded Wire Fabric. F TO F: Face to Face. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FAG: Fire Alarm Gong. FAO: Finish All Over. FAR: Floor Area Ratio.