Remove Feasibility Remove Inspections Remove Presentations Remove Visualization
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. While some could argue that some issues are better left unsaid, it is not at any one interest to continue to pretend as everything is right and thus failed to present our side of the case.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Safety Programs

Safety Services Company

Hazard Identification and Control: Your company should perform periodic inspections and have procedures of identifying existing or potential hazards in the workplace and eliminating or controlling them. Aside from regular inspections and review, the assigned supervisor will also conduct spot checks and random inspections.

Safety 48
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Streamlining Ordering TechniquesUse of Oral Presentations. Consider using oral presentations to reduce lead time and contractors’ proposal preparation costs. Plan ahead for oral presentations to allow sufficient time for scheduling of conference room space and evaluators attendance. Work Orders Within Task Orders.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. WORKFORCE DEVELOPMENT. 50,000 (max.) 150,000 (max.)

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Hawaii-based companies that receive Phase I feasibility study SBIR awards can apply for funds from HTDC’s Hawaii SBIR Matching Grant program. The expensing deduction is representative of the difference between the cost of the item and the present value of the stream of depreciation deductions allowed under normal federal depreciation rules.

Income 75