Remove Feasibility Remove Presentations Remove Software Remove Visualization
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. While some could argue that some issues are better left unsaid, it is not at any one interest to continue to pretend as everything is right and thus failed to present our side of the case.

article thumbnail

Total Station in Surveying | Operations of Surveying | Advantage & Disadvantage of Surveying | Types of Surveying | Uses of Surveying

CivilJungle

Selection of a particular model, together with the associated data collector and CADD software , requires some study. Compatibility with present data collectors (if not purchased with the total station), such as (including batteries and battery life), simplicity of performance, and training requirements.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Any and all personnel involved in the use or maintenance of fall protection or who may, in the course of their work, be present on any elevated surface without a guard rail are required to have regular training in fall protection safety. Visually inspect for corrosion. Visually inspect equipment for body shearing or pinch points.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts.

Income 108
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

The benefits include centralized and visual communication, early exploration of options, sustainability, efficient design, integration of disciplines, site control, as built documentation, etc.–effectively The management of work processes and software tools to produce required project information. 1) [link]. BIM Implementation.

BIM 40
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

This includes property such as microscopes, chemical reagents, and software. Training programs must be approved by the Technical College System of Georgia and must be for quality and productivity enhancements and certain software technologies. The total amount cannot exceed $1,250 per employee per year.

Income 75
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Streamlining Ordering TechniquesUse of Oral Presentations. Consider using oral presentations to reduce lead time and contractors’ proposal preparation costs. Plan ahead for oral presentations to allow sufficient time for scheduling of conference room space and evaluators attendance. Work Orders Within Task Orders.