SETTING OUT OF FOUNDATION TRENCHES
The Constructor
NOVEMBER 15, 2011
The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) All the levels on site should be obtained from a fixed datum previously determined by the Surveyor.
Let's personalize your content