article thumbnail

Green Building Transactional Due Diligence

Green Building Law Update

As ever larger numbers of green buildings are bought and sold, due diligence related to the green features of commercial buildings takes on an increasing importance. Green Building Council, was also a co-originator of Phase I ASTM standard. It is curious that Mike Italiano, one of the three founders of the U.S.

Green 120
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Timber: This is the most common material used for bracing members to the form face. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times. However, if the formwork is curved, a thinner plywood is used to facilitate bending. Like plywood, it can be easily cut to size on site.

Materials 136
article thumbnail

7 Construction Trends That Will Propel the Industry in 2022

Lets Build

Traditional methods of acquiring materials have also been hampered by the COVID-19 pandemic, causing contractors to explore 3D printing as an alternative. They can, for example, perform a visual inspection of high-risk areas like tall buildings, smokestacks, and partially completed bridges. Green construction.

article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Depending on how big or complicated the pour is, the inspection may just take few minutes or it could take hours. There are different release agents depending on what material is used for the formwork. Only when the formwork has been approved, may the pour take place.

Concrete 235
article thumbnail

How Has Covid Affected the Construction Industry?

Lets Build

Some companies have introduced limits on the number of staff in defined areas, while the increasing adoption of RPE (rate of perceived exertion) also helps to mitigate risks. We recommend a post-COVID risk assessment on IT systems, probing for weaknesses. Read more: Five benefits of inspection reporting software.

article thumbnail

TEMPERATURE EFFECTS ON CONCRETE

The Constructor

Knowledge of the magnitude of the thermal movement is necessary to evaluate the risk of thermal cracking in situations where large thermal gradients are likely to occur, and to calculate dimensional changes in structures such as bridge decks. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

Concrete 194