Remove Inspections Remove Materials Remove Procurement Remove Roads
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times. Note the different thickness: A standard plywood thickness on site is 18mm.

Materials 136
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

5 Current Construction Industry Challenges and How Technology Can Help

Fieldwire

With the current supply shortage driving up the costs of construction material, waste is not only inefficient but can also dissolve the profit of a job quickly. The fact is, without material, a job site is at a standstill. There is no substitution for timely materials and equipment.

article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Depending on how big or complicated the pour is, the inspection may just take few minutes or it could take hours. Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Only when the formwork has been approved, may the pour take place.

Concrete 235
article thumbnail

HYBRID CONSTRUCTION TECHNIQUE AND STRUCTURAL.

The Constructor

The different materials are used according to their strengths and weaknesses to provide simple, buildable and competitive high-quality structures that offer consistent performance. Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

Concrete 214
article thumbnail

Building Hong Kong's Airport

The Constructor

Construction of the new airport was only part of the Airport Core Programme, which also involved construction of new road and rail links to the airport, with associated bridges and tunnels, and major land reclamation projects on both Hong Kong Island and in Kowloon.

Airports 203
article thumbnail

Subways in America

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

America 203