Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

Consistent delivery of quality repair, renovation, maintenance, and new build projects on time and on budget is possible using an integrated planning, procurement, and project delivery solution. References: • Abdirad, H., & Dossick, C. contact-form] Learn more about… Choosing IPD & Lean. Team Selection. Clarity of Goals.

article thumbnail

Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

Lack of recognition by senior management of the linkage between between the built environment and organizational mission Low level of understanding of both life-cycle total-cost-of-ownership management and integrated lean planning, procurement, and project delivery principles and processes. References. Life cycle costing.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges.

article thumbnail

Measuring a building’s embodied carbon

Construction Specifier

The magnitude of their impacts is the driving force behind many initiatives to improve tomorrow’s structures—from energy regulations and government procurement policies to green building rating systems and programs such as the Architecture 2030 Challenge. Life-cycle assessment. Measuring carbon footprint in building materials.

article thumbnail

Lean methodology is ignored by the construction sector

Job Order Contracting

While there has been a fair amount written about Lean principles, actual application in the form of an integrated construction planning, procurement, and project delivery methodology has been limited to 5% or less actual work. References: Abdelhamid, T. Lean Maturity, Lean Sustainability. Lean Construction Reading Primer.

article thumbnail

Construction Cost Estimating Trends – 2014 and Beyond

Building Information Management

Demand for higher productivity in the construction sector and environmental sustainability is reaching a critical level and causing significant changes in both construction cost estimating and the AEC industry as a whole. Major Trends: Shift to life-cycle cost visibility for new construction, renovation, repair, operations, and maintenance.

article thumbnail

Job Order Contracting Information

Job Order Contracting

Also referred to as the “Design-Bid-Build” process, this system has long been the most prevalent option for large and small public works contracts. Related Resources: ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management. public contracts.

Contract 100