Remove 2004 Remove Commissioning Remove Regulation Remove Zoning
article thumbnail

Maryland Vetoes Renewable Energy Portfolio Standard Increase

Green Building Law Update

Maryland first adopted a Renewable Energy Portfolio Standard in 2004 and has subsequently increased it. That rate does not include that at the time of the veto, pending before the Maryland Public Service Commission was a Baltimore Gas and Electric Co. and the very highest among all south Atlantic states.

Maryland 149
article thumbnail

Maryland Bans Polystyrene and Enacts 31 other New Environmental Laws

Green Building Law Update

Maryland has been described as having more pages of environmental statutes and regulations on a per capita basis than any other state. The Maryland Department of the Environment (MDE) may adopt regulations to implement the bills. The Governor has until May 28, the 30th day after presentment to sign or veto bills. Clean Energy Jobs.

Maryland 120
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FEATURE STORY: High-Tech Hubs Are Moving To Their Markets

Buisness Facilities Contributed Content

A recent KBA-commissioned study by Tufts University found “tremendous breadth and depth of expertise” among the region’s CROs and related service providers, covering the range from discovery, formulation and toxicology to bioanalytics, clinical trials, regulatory services and commercial support. Rick Perry in a statement.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements.

article thumbnail

State Law Trumps on Location of Solar Panels

Green Building Law Update

This case is instructive beyond Maryland’s borders because it involves the intersection of states’ efforts to promote solar energy generation as part of its renewable energy policies, and county governments’ local planning and zoning prerogatives. was originally enacted in 2004 to facilitate the State’s transition to renewable energy sources.

Maryland 120