article thumbnail

Revit OpEd: Egress Path Options

Revit OpEd

In 2006 I demonstrated (at Autodesk University) the then new line based family type by explaining how we could use it to document egress path requirements also known as exiting plans. Defining the requirements for documenting exiting are naturally going to affect the success of any solution we try to provide. ► 2006.

Revit 81
article thumbnail

LEAN OpenJOC(TM) Job Order Contracting for Sustainable Facilities Repair, Renovation, and Minor New Construction

Job Order Contracting

The primary advantage of JOC has historically been is the flexibility permitted in ordered quantities and delivery scheduling. A public agency can place orders with one or more contractors when the actual need appears and received on-demand services from a vetted service provider. General Service Administration (GSA), 2006.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit Beginners: Sort by Submittal Package

Revit Beginners

Friday, June 09, 2006. Quite often we need to organize our plots for different submittal package sets (Schematic Design Presentation, Land Use Permit, Plan Check, Construction Admin, etc). Now you can do the same for each of your submittal packages (LUP for Land Use Permit, ConDocs for construction documents, etc).

Revit 40
article thumbnail

Integrated Project Delivery – IPD, Job Order Contracting – JOC, BIM, and Efficient Project Delivery

Building Information Management

Provide access to all applicable record documents. Assist with permitting process, if needed. During the first two years for the program, April 2006 to April 2008, 34 projects were completed with a total projects value of $3,029,593. the first two years for the program, April 2006 to. Discuss access and staging issues.

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

Date of Last Roofing Permit. Date of Last Roofing Permit. Sign the application form to grant the building consent once satisfied on reasonable grounds that if the building work was to be constructed in accordance with the approved documents, then compliance with the Building Code will be met. Dutch Gable Roof. Pavillion Roof.

article thumbnail

Feature Story: Shovel-Ready Sites – Fired Up, Ready To Go

Buisness Facilities Contributed Content

Developed in cooperation with Greater Spokane Incorporated (GSI), the City of Spokane Site Certification program allows for property owners to have their property deemed shovel-ready and speed the process for permit application on their site. Its environmental review has been completed and fast track permitting is available.

Site 66
article thumbnail

Achieving Best Value for Facility Renovation, Repair, Maintenance, and Construction – 2016 and Beyond

Building Information Management

Owner prepares “bridging documents” that provide a schematic/conceptual design. Upon selection of a DB contractor, design, permitting, and construction responsibilities belong to the DB contractor. The process is typically as follows: Owner enters a contract with a single entity for design and construction services.