Remove 2007 Remove Documentation Remove Project Management Remove Schedule
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., Lower project related cost growth. Projects completed at or under budgeted cost. Reduced project related cost growth per change order.

article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Seeing client on calendar | activeCollab - Project Management and.

Construction Dive

Schedule a Presentation. activeCollab Manager (Windows). activeCollab Manager (Mac OS X). Documentation. ©2007‐2012. Set Up a Free Demo. Events & Webinars. activeCollab Timer (Windows). activeCollab Timer (Mac OS X). News & Announcements. Community Forums. Translations. Getting Started.

article thumbnail

STAAD PRO MANUELS & GUIDES

The Constructor

Related posts: Design of Offshore Structures using STAAD.Pro and STAAD.Offshore STAAD.PRO 2007 Posted in Category: Software Manuels 1 Comment Sharath chandra Posted on 29/10/2010 at 21:42 can anybody please tell me where can i get the STAAD software???? He is the founder of The Constructor and works in a reputed construction company.

Concrete 115
article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

Until 2007 it was the tallest building in the PRC, the fifth tallest in the world by roof height and the seventh tallest by pinnacle height. Its height was surpassed on September 14, 2007 by the Shanghai World Financial Center. It contains offices and the Shanghai Grand Hyatt hotel. Related posts: civil engineering?

article thumbnail

PSMJ Resources Blog: 8 Quality Control Tips Every PM Should Know

PSMJ Resources

Encourage those actually doing the work, not just principals, to stamp or seal documents. Build into a project’s schedule and budget the time and costs of review by individual(s) not involved with the initial design. Have a final design review after all documents are prepared. ► 2007. (8). Site Meter.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Accompanying the technical documentation are instructions for creating the HVACie files using commercial design software. At this intial stage of the project we are working on defining the requirements for design deliverables at the Construction Documents Statge of Design (100% Design) and at the Construction, Ready For Fabrication stage.