article thumbnail

Feature Story: 2016 Economic Development Awards

Buisness Facilities Contributed Content

By Business Facilities Editorial Staff From the March/April 2016 Issue. Our 2016 awards include recognition for the locations that have led the way in smart-grid modernization, innovative funding for infrastructure projects, renewable energy breakthroughs and new tools for supporting startups and entrepreneurs.

Indiana 40
article thumbnail

Surprise Jobs Rebound Could Trigger Recovery

Pro Builder

The estimates revealed that the seasonally adjusted annual sales pace of new, single-family homes was effectively unchanged from March, with the measured volume at a 623,000 annualized rate. The data showed a 9% week-over-week gain, with a 54% improvement since early April. These less-dense markets comprise roughly 44% of the U.S.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Q2 Construction Labor Costs $28.13/Hour

Job Order Contracting

Production responsibilities for establishments in this sector are usually specified in (1) contracts with the owners of construction projects (prime contracts) or (2) contracts with other construction establishments (subcontracts). 1st quarter 2016. Workforce Statistics. Data series. Employment (in thousands). P) 6,643. (P)

article thumbnail

Sage Construction Project Center and Sage Bid Management – New cloud based solutions for construction professionals

Construction Cost Estimating

Sage Bid Management facilitates the estimators and bid coordinators to deal with all phases of the bid process in an efficient manner together with maintaining a complete and up-to-date bidders list via a single cloud-based location.

Sage 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 43 26 Estimated Quantities Form. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 43 26 Estimated Quantities Form. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 26 05 73.19

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The credit is applicable to work performed before July 1, 2016 for the North Slope and Cook Inlet; for areas outside the North Slope and Cook inlet the credit is applicable to work performed before January 1, 2022 as part of the More Alaska Production Act passed in 2013. ARIZONA – updated for 2014.

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 43 26 Estimated Quantities Form. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 43 26 Estimated Quantities Form. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 26 05 73.19